This maisonette apartment is ideal for families who want to combine modern living with flexibility. The unique living concept includes additional, light-filled living space on the lower level, creating generous room for family, leisure, and hobbies.
Room Layout
Ground Floor: Entrance hall, WC, storage room, spacious living kitchen with access to the terrace and private garden
Upper Floor: Entrance hall, bathroom with shower and WC, second bathroom with bathtub, three rooms – two of which have balcony access
Lower Level: approx. 38 m², divided into two large rooms, supplied with daylight through an atrium – versatile use as a hobby room, youth area, fitness room, or storage space. Access directly from the apartment and from the underground garage.
The apartment is oriented towards the quiet inner courtyard; the private garden is partially landscaped and offers space for playing and relaxing.
Special Highlights
Private terrace & garden with electricity and water connection
Two balconies on the upper floor
Daylight basement rooms with a unique atrium – flexibly usable.
Two bathrooms and an additional WC
Modern equipment: parquet flooring, underfloor heating with individual room control, high-quality windows with triple glazing and electric external blinds
Option for underground parking space (€ 30,000,-)
The Project
The apartment is part of a new building with only 7 units in Oberlaa, featuring modern architecture, sustainable energy technology (heat pump, photovoltaic), and high-quality fittings. Completion is scheduled for spring 2026.
Location & Leisure
The combination of a central location (U1 and southeastern tangent reachable within minutes) and high quality of life makes Oberlaa particularly attractive. Parks, the Therme Wien and numerous recreational opportunities ensure that the whole family feels comfortable.
A home that creates perfect conditions for your family life with a garden, balconies, and additional light-filled basement rooms – spacious, flexible, and future-proof.
Construction has already started, and the expected completion will be in spring 2026. The apartments are already being sold during the construction phase based on the developer contract law.
I am happy to provide you with personal advice! The apartments are already being sold during the construction phase based on the developer contract law.
The images are exclusively renderings or promotional pictures. There is no claim to an actual design or presentation.
Fittings according to the construction description (the shown furnishings are not part of the delivery scope and serve only as furnishing suggestions). All depicted items are symbolic. Printing and typesetting errors, as well as mistakes and construction-related changes are reserved. The apartment sizes are approximate and may vary slightly due to detailed planning. Any potential price changes are also reserved by the developer. In any case, the purchase contract is decisive.
Note according to energy certificate draft law: An energy performance certificate has not yet been submitted by the seller or owner, after being informed of the obligation to provide one. Therefore, the energy performance of a building of similar construction type and age is considered. We assume no responsibility or liability for the actual energy efficiency of the property offered.